![]() “We are excited to get this very important connector between Harris County and Montgomery County built,” stated Precinct 3 Commissioner James Noack, who partnered with Harris County Precinct 4 Commissioner Jack Cagle on the project. The new southbound bridge will have a safety shoulder for motorists to access in case of vehicle breakdown. The sidewalk and existing 8-foot shoulder along the northbound side will remain. ![]() The existing bridge lanes will become the two northbound lanes. The widening includes the construction of a 1,817-foot bridge crossing over Spring Creek for the two new southbound lanes. The road pavement will be 10-inch jointed reinforced concrete with 8-inch stabilized subgrade. It will result in two 12-foot lanes in each direction. The project will widen Gosling Road to a full four-lane boulevard between Creekside Forest Drive in Harris County and Gatewood Reserve Lane on the north side of the project in Montgomery County. Advertising should last three weeks, with a proposed bid date of Monday, June 21. ![]() SPRING, TX - The Gosling Road widening project is scheduled to go out for bid Friday, May 28, according to Harris County officials.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |